Aquina, K. (1)
A report on the visit to RD Cannery in Madang and the national analysis laboratory (Lae): Meeting the European Union (EU) Requirements in preparation for the EU inspectors visit
Author(s): Noan, P., Aquina, K., Jon, T.
Publisher: Inspection and Enforcement Branch, National Fisheries Authority
Year: 1999
Held at: P1395 SU Pa 1999
Identifiers: European Union visit; inspection; analytical laboratories; fish laboratory; testing
Control No.: 00012660.nul